China sourcing coordination for prefabricated residential houses. Send a sourcing brief
Engineering floor where residential module drawings are checked against load sheets

About Lindal Cedar Homes

We coordinate China supplier search and evidence review independently. This site is separate from the original brand and has no distributor authorization.

The desk requests load basis, coating documents and a dated option matrix before comparing supplier quotations.

What the desk is for

This independent procurement desk coordinates supplier matching, quotation comparison, sample review, inspection planning and export documents for prefabricated residential houses. We ask each candidate supplier to provide project-specific capacity, material and quality records before a buyer relies on them.

We make no claim about our own production capacity. Supplier figures and test reports must be checked for the specific product and project.

What a release must contain

A release names the design wind speed, ground snow load, seismic basis, steel grade, galvanized coating mass, panel core and thickness, and the interior options that are inside the price. A house quoted as a 1,300 sq ft or 1,700 sq ft plan still needs those lines. Square footage does not select EPS, PIR or rock wool, and it does not decide whether the frame is welded in the plant or bolted on site.

For repeat orders, we ask suppliers to document first-unit dimensions and subsequent inspection checkpoints. Acceptance limits and corrective action belong in the purchase specification.

How supplier evidence is reviewed

Criteria before cladding

Cedar or other finishes are sampled after the structure and the envelope are accepted. A finish board is not used to imply a structural grade.

One freeze date

Shell, partitions, lighting points, sanitary positions and furniture, when furniture is in scope, close on a written date. The agreed option matrix is the reference for supplier comparison and later changes.

Exposure picks the coating

Z275 is a starting coating for enclosed light-gauge walls. Coastal spray, industrial dust or a desert wetting-drying cycle changes the note, including repair at cuts and welds.

Scope written in the negative

The file states what is outside the order: local foundation design, the permit, and any fire rating that was not assessed on the full assembly.

Evidence points in the procurement workflow

Review table with connection sketches
Criteria review, China sourcing desk
Light-gauge wall panel on a jig
Supplier jig inspection point
Weld sample station
Weld and coating check
Volumetric module bay
Supplier module bay assessment
Panel core samples of EPS PIR and rock wool
Core samples kept with the file
Foundation interface template on a slab
Foundation interface, site side

Ask for the calculation path, not a slogan

We coordinate with supplier technical contacts and buyer-appointed engineers. Availability of welding, envelope and logistics specialists must be verified for each shortlist. If you are sending a house inquiry rather than a hiring note, use the form and include the jurisdiction.